link here  | |  tools  |  share:
photo size: medium 640 new

Martin G. Conde
recent  |  interesting  |  random  |  favorites  |  contacts  |  sets  |  tags:  

RARA 2022: 9.7). The Metro C Project and the Archaeological Excavations, Architectural Surveys and Historical Studies in Rome (2005-2022): Summary - the Piazza Venezia, Colosseo and the San Giovanni Metro Stations (2022).

loaded 4 / 200 - 2%